Steel girder hanging from a crane hook against a cloudy sky

IMS Projects · Project management and erection engineering

One project.
One lead.

We provide project management for large industrial projects in steel construction, from work preparation to acceptance. Whether scheduling, erection planning or documentation, you receive all services from a single source and one dedicated contact for your project.

Execution management

Planned
meets actual.

On large projects, interfaces determine success. We structure your project, create a robust schedule and continuously compare planned and actual progress. Whether client, designer or subcontractor, we coordinate all parties involved and create transparency and planning certainty.

  • Project structure and scheduling
  • Interface management
  • Planned versus actual control
  • Quality and occupational safety
Two engineers with a laptop coordinating in front of construction cranes

Erection planning

Every phase
thought through.

Safe erection starts with a well considered concept. We define the erection sequence and construction stages and align connections and tolerances with fabrication at an early stage. Whether pre-assembly, transport or temporary works, every step is planned before the steel reaches the site. The lifting concept with load determination and crane positions is one building block. This reduces risk and ensures a stable erection process.

  • Erection concepts
  • Construction stages and sequence
  • Pre-assembly and logistics
  • Lifting concepts

Documentation

Fully
documented.

Our welding engineers supervise all welding work and document it in accordance with the applicable standards. In addition, we handle the complete site documentation, from the site diary to the acceptance records. You receive traceable, audit-ready documentation that supports a smooth acceptance of your project.

  • Welding supervision
  • Welding documentation
  • Inspection reports
  • Acceptance records

About us

From Leipzig.
Part of the
IMS Group.

IMS Projects is the engineering and project management company of the IMS Group, based in Leipzig. Our team of civil and welding engineers and steel construction technicians plans and manages your projects together. Our managing director holds a master’s degree in project management.

For execution, we rely on IMS Berlin and an EU‑wide network of qualified partner companies. This allows us to provide the right capacity for every project and to combine engineering and erection from a single source.

One project. One lead. One group.

IMS Group

  • IMS Industriemontage & Schweißtechnik GmbH, Berlin, visit website
  • IMS Projects GmbH, Leipzig

Contact

Let’s talk about
your project.

IMS Projects GmbH
Gohliser Straße 20 · 04105 Leipzig · Germany